I'm adding a second switch to a remote office which currently only has 1 switch. I want to use the StackWise cables to do it. Is this the process? 1. Change the IOS on the new switch to the same as the production switch 2. Copy the config from the production switch to the new one 3. Set the switch priority number on the production switch to #1 4. Turn everything off, cable it up, turn on production switch, turn on new switch Thanks in advance, Jon .